Rock Protection to the Control Tower – Jizan Port

SR 1.36M

Total
value

2012

Completion
Date

Owner : Seaport Authority

Status : Completed

Description

• The scope was to execute the slope protection and Riprap works for 300 LM.
• Rehabilitation of the existing caisson including under water concrete mortar injection,
rock backfilling & heavy dutycover slabs.