Owner : Ministry of Agriculture
Status : Completed
Description
• Dredging of 126,000 m3 for the basin and the quay wall trench.
• Construction of 450 m Breakwater, 5.5 m depth at Roundhead.
• Construction of 225 m Quay wall with 3 m depth.
• Supplying and installing floating docks 1,000 LM, 3m width.
• Executing the bathymetric survey using single beam echosounder
• Construction of 2 administration Buildings with 1,150 m2 total area – 3 floors.
• Construction of coast guard building – 2 floors
• Landscape, Concrete Fence, and 3 Gates.