Construction of new berths (from 26 to 31) at Jeddah Islamic Port

SR 458,470,500

Total
value

2025

Completion
Date

Owner : Mawani

Status : Ongoing

Description

Dredging works of 2,000,000 m3 (to reach a level of – 16 M).

– Construction of new berths (from 26 to 31) with a depth of (-16 m) instead of the existing berths in Jeddah Islamic Port, with a total length of (1100 M).
– Demolition and removal of berths and services from berth 26 to berth 31. The work includes breaking the concrete floors and normal and rock bridges behind the berths.

– Construction of new berths for precast concrete blocks with a depth of (- 16 m) – Deepening the southeastern basin and in front of the berths from 26 to 31 at a depth of (-14.5 m)
– Supplying and installing (fenders, bollards, etc.) on the new berths

– Executing of MEP works
– Executing the bathymetric survey using multi-beam echo sounder