Owner : Ministry of Agriculture
Status : Completed
Description
• Dredging of 350,000 m2 in the basin and the quay wall trench.
• Construction of 1260Lm Breakwater, 6.0 m depth at Roundhead.
• Construction of 305m Quay wall with 3m depth.
• Construction of 3,640 Lm of floating docks 3 meters width.
• Construction of (2) Slip-ways.
• Construction of (1) Coast Guard building with 100 m2 total area – 2 floors.
• Landscape, infrastructure works, Concrete Fence, MEP works and 3 Gates.
• Executing the bathymetric survey using single beam echosounder