Owner : Seaport Authority
Status : Completed
Description
• Dredging of 57,000 m3 in the turning basin and the quay wall trench.
• Construction of 220 lm Quay wall with 2m height.
• Construction of 140 lm wave breakwater.
• Construction of slipway for boats maintenance and repair
• Landscape and roads asphalting
• Executing the bathymetric survey using single beam echosounder