Construction of 2 Berths – Duba Port

SR 25.9M

Total
value

2014

Completion
Date

Owner : Seaport Authority

Status : Completed

Description

• Deepening works (- 6 meters)
• Construction of two quay walls (Ferries and coast guard berths) 160 LM length,
6.0 m depth.
• The blocks weight are between (38~55Tons).
• Construction of berth yard (16,200m2) including reclamation and concrete asphalting.
• Infrastructure works (MEP works and electrical works).