Owner : Metito Saudi Ltd
Status : Completed
Description
• The project included the amount of dredging about 64,000 cubic meters and the welding of HDPE pipes with a diameter of several 1200 mm, 710 mm and 630 mm, a total length of about 3500 meters, covered with ballast concrete according to the diameter and layers of stone protection. Each installation of these pipes is in exactly level and coordinates all these pipes connected to the floating Barges