المالك: حرس الحدود
الحالة : تحت الإنشاء
Description
Dredging works depth (-4 meters) – construction of a 60-meter pier –
Construction of a basin with a capacity (150 tons) –
Yard works of concrete slabs –
Protection works for Seoul with natural stones –