المالك : الهيئة العامة للموانئ
الحالة : مُنجز
Description
• Dredging of 1,500,000m3 (-14.0 m for Turning Basin & -22.00 m under the quay wall).
• Construction of 410 LM quay wall (from -17.0 m to +3.0m)
• Casting and placing of 52,000m3 concrete blocks (119 ~150 Tons each)
• Rocks placement 160,000m3 for the trench bed soil replacement, rock fill behind the
quay wall and the scouring toe
• Reclamation and furnishing of 88,000 m2 yard with heavy duty concrete slabs
• Executing of MEP works
• Executing the bathymetric survey using multi-beam echo sounder