المالك : مواني
الحالة : مشروع قائم
Description
Dredging works of 2,000,000 m3 (to reach a level of – 16 M)
Construction of new berths (from 26 to 31) with a depth of (-16 m) instead of the existing berths in Jeddah Islamic Port, with a total length of (1100 M)
Demolition and removal of berths and services from berth 26 to berth 31. The work includes breaking the concrete floors and normal and rock bridges behind the berths
Construction of new berths for precast concrete blocks with a depth of (- 16 m) – Deepening the southeastern basin and in front of the berths from 26 to 31 at a depth of (-14.5 m)
Supplying and installing (fenders, bollards, etc.) on the new berths
Executing of MEP works
Executing the bathymetric survey using multi-beam echo sounder