المالك : روشن
الحالة: مشروع قائم
Description
– Digging the canal
– Dewatering system
– Installation of a temporary intake pipe, suction pipe and temporary pumping facilities
– Land improvement works
– Excavation work in the canal
– Build a channel edge selection wall
– Treating the marine edge of the canal
– Maintaining the quality of the lake’s water
– Bridge construction
– Road works